» Photos
This photo shows how a 42" length of the existing spline roadbed was cut out where it spans the river. I have also installed 1/4" plywood to support the river bed:
This closeup photo shows how the left (north) end of the temporary bridge roadbed is supported on a cleat temporarily screwed to the permanent riser:
This closeup view shows the right (south) end of the temporary bridge roadbed with the first layer of cork roadbed installed across the gap:
.